Treatment Area:


Place Where Treatment Required


Chemical Industries:


  • Process Plant Area
  • Process Reactors vessels
  • Tank Pad area
  • Storage Tanks
  • Pump Foundation area
  • Effluent Treatment Plant area
  • Warehouse
  • Drains

Dyes Industries:


  • Process Reactors vessels
  • Process Plant Area
  • Tank Pad Area
  • Storage Tanks
  • Filter Press
  • Pump Foundation area
  • Drains
  • Effluent Treatment Plant Area

Petrochemical Industries:


  • Effluent Treatment Plant Area
  • Steel Structures | Process Plant Area
  • Cracker Plant | Storage Tank Area
  • Control Rooms | Battery Rooms
  • Drains | Pump Foundation Area
  • D M Water Plant
  • Chimneys
  • Warehouse

Pharmaceutical Industries:


  • Tank Pad Area | Process Plant Area
  • Reaction Vessels | Packing Area
  • Storage Tanks | Pump Foundations
  • Warehouse | Effluent Treatment Plant Area
  • Pipeline Projects | Battery Rooms
  • Control Rooms | Collection Pits

Power Projects:


  • Pump Foundations
  • Turbine area
  • Battery Rooms
  • Control Rooms
  • Drains
  • Effluent Treatment Area

Steel Industries:


  • Process Area
  • Chemical Tank Storage area
  • Pickling Area
  • Drains
  • Effluent Treatment Plant area

Automobile Industries:


  • Pickling Area
  • Assembly Area
  • Paint Shop
  • Work Shop area

Paints Industries:


  • Structure
  • Process Area
  • Reaction Vassals
  • Storage Tanks
  • Effluent Treatment Plant area

Our Solutions (Acid and Alkali Proof)


Brick lining (BR):


  • 230x115x38mm (BR/38)
  • 230x115x75mm (BR/75)
  • 230x115x65mm (BR/65)

Tile Lining (TL):


  • 200x100x20mm (TL/20/J)
  • 230x115x20mm (TL/20/K)
  • 230x115x25mm (TL/25/K)
  • 300x300x10mm (TL/10/J)
  • 300x300x12mm (TL/12/J)
  • 300x300x15mm (TL/15/J)
  • 200x200x15mm (TL/15/J)

Redmandana Stone Lining:


  • 1.5’ x 1.5’ x 1” – 1.5” (RMS/2.25)
  • 2.0’ x 2.0’ x 1” – 1.5” (RMS/4.0)
  • 2.0’ x 1.5’ x 1” – 1.5” (RMS/3.0)

Bituminous Mastic Compound:


  • 6mm (MST/6)
  • 10mm (MST/10)
  • 12mm (MST/12)
  • 25mm (MST/25)
  • 50mm in two layers (MST/50)

Bituminous River Sand Bed:


  • 25mm (RMST/25)
  • 50mm (RMST/50)
  • 75mm (RMST/75)
  • 100mm (RMST/100)

Antistatic Mastic Lining:


  • 25mm (AMST/25)
  • 50mm (AMST/50)

Epoxy Screed Lining for Floor:


  • 2mm (EPS/2)
  • 3mm (EPS/3)
  • 5mm (EPS/5)

Epoxy Screed Lining with Glass:


  • 2mm (EPSC/2)
  • 3mm (EPSC/3)
  • 5mm (EPSC/5)

Epoxy Coating:


  • Sand Blasting + Primer + intermediate coat + Top coat (for Steel Structure) (EPPST)
  • Putty + Primer + Top coat (for Walls) (EPPWL)

Poly Urethane Painting on Wall, Floor and Structure:


  • Sand Blasting + Primer + intermediate coat + Top coat (For Steel Structure) (PUPST)
  • ┬áPrimer + Top coat (for Walls, Floor) (PUPWL)

Epoxy Self Levelling in various Thicknesses on Floor:


  • Primer + 1mm GAL SL (SL1)
  • Primer + 1mm Screed + 1mm GAL SL (SL1/1)
  • Primer + 1mm Screed + 2mm GAL SL (SL1/2)
  • Primer + 2mm GAL SL (SL2)

Epoxy Antistatic Lining:


  • Primer + 2mm SL AntiS (SLA2)
  • Primer + 1mm Screed + 2mm SL AntiS (SLA1/2)

Epoxy Coving to Avoid Corners Between Floors to Wall, Wall to Wall, Wall to Ceiling:





Copyright © Gayatri Corrosion Controler 2016